The short answer
Aim for a fall of about 1 to 2 percent away from the house. In everyday terms, that is about 1/8 inch to 1/4 inch of drop for every foot, measured from the house outward.
This is a practical target rather than a rule that applies to every material. Set the fall in the base, then check it at several points before you lay the final surface.
Why that range works
A fall below about 1 percent can leave water sitting on the surface, especially if the base settles unevenly. A fall above about 2 percent makes the patio harder to use. Chairs and tables drift, and wet stone or concrete gets more slippery as the grade increases. Accessibility guidelines for walkways aim for a side-to-side slope of about 2 percent or less, which makes a reasonable upper limit for a patio too.
A common search is “is 1% slope enough for drainage.” A 1 percent fall is a reasonable minimum on a well-built base, but it is not a guarantee. Soil, the amount of water arriving from uphill and the quality of the base all change the result.
Working out the numbers
A 1 percent fall drops about 1.2 inches over a 10-foot run. A 2 percent fall drops about 2.4 inches over the same distance. A 20-foot-wide patio at 2 percent would fall about 4.8 inches from one side to the other.
To check a planned or finished surface, use a long level on a straight board, or a laser level. Measure the drop at several points across the patio and compare it with the distance. A string line with a line level works too.
What changes on a sloped yard
If the natural ground is steeper than the patio you want, do not tilt one large surface to match the hill. Build the patio in level sections or steps, each with its own gentle fall. That keeps the walking surfaces comfortable, though it usually means more grading or a retaining wall. Each section still needs to drain to a safe outlet and away from the house.
How the base sets the slope
The fall comes from the base, not the top layer. Grade the base to the target fall, compact it in layers and check it with a level as you go. Then set the surface on top.
- For pavers, the sand bed sets the surface, so both the base and the bed need the fall.
- For poured concrete, the forms set the grade. Check them for level and fall before the concrete arrives.
- For gravel, a slight fall helps water move, but the edging on the low side does the most to keep the stone in place.
The question of paver slope
The question of how much slope is needed for a paver patio often comes up first with pavers, because the joints and base make the fall easy to get wrong. The same 1 to 2 percent range applies. Check the grade before you lay the first row, not after the patio is finished.
Common mistakes
- Setting the fall by eye. Use a level, and check again after the base is compacted, since compaction can shift the grade.
- Building the base flat and hoping the surface will drain. The base sets the water path.
- Sloping the surface toward the house, which puts water against the foundation.
- Forgetting the edges. Water that drains off one side needs somewhere to go.
Getting patio grading slope right before the base is compacted saves rework, and it is much easier than correcting a surface after the pavers or concrete are down.