Patio Grading Slope
Learn how much slope a patio needs, usually 1/8 to 1/4 inch per foot away from the house, and how to measure and grade the base for drainage.
Patio Pavers, Stone and Concrete
How much slope a patio needs for drainage and what goes in the base.
Start here
Learn how much slope a patio needs, usually 1/8 to 1/4 inch per foot away from the house, and how to measure and grade the base for drainage.
Usually not for a patio. Sand is a thin bedding layer, and a compacted gravel base does the real work of carrying weight and draining water.
For a paver patio, aim for about 1/8 to 1/4 inch of fall per foot away from the house, built into the base and sand bed as well as the surface.
A 1% slope equals about 1/8 inch per foot. It's often a workable minimum on well-drained ground, but wetter sites usually benefit from closer to 2%.
Usually not for a new patio poured on soil, where about 4 inches is a common target. Overlays on sound existing concrete are a different job.