A deck framework is the structure under the boards. It carries the whole load: footings in the ground, posts and beams above them, joists across the beams, and a ledger board where the deck fixes to the house. Build it in order, checking that it is square, level and plumb at each stage, because boards laid on a frame that is out of true are hard to correct. Local building rules set the details, including footing depth, post and joist sizes and which inspections you need, so check them before you order any materials.
What the framework is made of
- Footings: concrete pads or piers that spread the load into the ground. In areas with frost, the bottom of each footing should sit below the local frost line.
- Posts: upright timbers that carry the beams. They sit on post bases, which keep the wood off the concrete.
- Beams: horizontal timbers on top of the posts that carry the joists.
- Joists: the timbers the boards are fixed to. For standard wood decking they are often spaced about 16 inches (40 cm) apart, center to center, but some board makers ask for closer spacing, so check the product sheet.
- Ledger: a board fixed to the house where the deck attaches. A freestanding deck has no ledger.
- Connectors: joist hangers, post bases and straps that hold the timbers together.
Check permits and buried services before digging
Many areas require a permit for a new deck, especially one attached to the house, raised above a set height or larger than a set size. Your local building department can tell you what applies and which inspections are needed. Before you dig, find out where buried pipes and cables run. In the US, call 811 before any digging; other countries have their own utility-locating services. Confirm the deck sits inside your property lines, and check any rules from a homeowners’ association if you have one.
Step 1: Set out the layout
Mark the deck’s outline on the ground with stakes and string, and check the corners before you dig. The marking process is covered in how to set out a decking frame, including the corners, post positions and height. Mark the center of each footing at this stage, because the holes are dug from those marks.
Step 2: Dig and pour the footings
Dig a hole at each footing mark to the depth your local rules require. The soil under each footing should be firm and undisturbed. If the ground slopes, the hole depths and post lengths change, so work out the levels first; how to level ground for foundation covers the preparation.
Set a post base or anchor into each footing while the concrete is wet, at the height the plan needs, and check it with a level. Let the concrete cure before you load it.
Step 3: Set the posts and beams
Fix each post to its base and brace it until it is plumb (vertical) in two directions. Then fix the beams to the posts with the bolts or connectors your plan specifies. How far a beam can span between posts depends on the size of the timber and the load it carries, so use the span tables in your local code or ask your building department. Keep ground-contact rated wood wherever it is near soil.
Step 4: Fix the ledger to the house (attached decks only)
If the deck attaches to the house, the ledger carries a large share of the load and is one of the most common points of failure. Fix it into the structural framing, such as the rim joist or band board, rather than only into the siding or cladding, using the lag screws or through-bolts your code requires. Install flashing above the ledger so water runs off the wall instead of soaking in behind it. Check the ledger is level, because every joist is set from it.
If you are building over an existing concrete slab instead of new footings, read can a concrete slab support a deck before you start, since the slab has to carry the load. If the wall is brick veneer, or you cannot tell what is behind the cladding, get advice before you fix anything to it.
Step 5: Hang the joists
Hang the joists from the ledger and the beams with joist hangers, spaced at the distance your board maker and local code require. Set each joist with its crown (the slight bow along its length) facing up. Use hangers and nails rated for the lumber you are using. Pressure-treated lumber corrodes ordinary fasteners, so use hot-dipped galvanized or stainless steel hardware.
Step 6: Check the frame is square, level and plumb
Before you fix the boards, check the frame in three ways. Check each corner with the 3-4-5 method, which is covered in what is the 3/4/5 rule for decking. Measure both diagonals of the whole rectangle: if they match, the frame is square. Then check that the beams and joists are level and the posts are plumb. Small errors are much harder to fix once the boards are down.
Step 7: Add bracing, stairs and railings, then the boards
Freestanding decks often need diagonal bracing from the posts to the beams to resist sideways movement, and many codes require it, so check yours. Build stairs and railings once the frame is solid. Whether a deck needs a railing depends on its height and local rules, so for a low deck, read does a deck 2 feet off the ground need a railing before you buy any railing parts.
Once the frame is checked, fix the boards with the fasteners the board maker specifies, and leave the gaps the maker recommends. Tiles can go on the boards later, and outdoor patio tiles over wood deck covers that option; artificial grass over decking covers turf instead.
Common framing mistakes
- Spacing the joists wider than the boards allow, so the surface feels bouncy.
- Fixing the ledger to siding or brick veneer rather than to the structural framing behind it.
- Leaving out flashing above the ledger.
- Using ordinary nails or hangers with pressure-treated wood.
- Digging the footings before the layout has been checked.
- Skipping a permit or inspection that is required.
When to bring in a professional
Get help with a deck that is tall, attached to an older house, built over a slab or has an unusual shape. Many areas inspect footings and framing before they are covered up, so ask your building department which inspections apply. For the main price drivers before you commit, see what’s the average cost to build a 20x20 deck.