A 20x20 concrete slab has no single price. The total depends on your region, the thickness, the base under the slab, delivery, and whether you pour it yourself or hire a crew. What you can work out on your own is how much concrete the slab needs, which is the starting point for any quote.
How much concrete does a 20x20 slab need?
Multiply length, width and thickness, with the thickness converted to feet. A 20-by-20-foot area is 400 square feet. At 4 inches thick, or one-third of a foot, that is about 133 cubic feet. There are 27 cubic feet in a cubic yard, so the slab needs about 4.9 cubic yards of concrete.
Thicker slabs need more concrete. Driveways and areas that carry vehicles generally call for thicker slabs than a patio does, so ask your supplier what thickness your use requires. Many people order a little extra to cover uneven spots in the base.
Why bags usually don’t work at this size
An 80-pound bag of concrete mix yields about 0.6 cubic foot. Covering 133 cubic feet would take more than 200 bags, which is hard to mix, haul and place in one session. Most people with a slab this size order ready-mix delivered by truck instead. Suppliers usually sell it by the cubic yard, and many add a delivery charge or a minimum order. If the truck cannot reach where the concrete is needed, a pump may be required, which adds cost.
What goes into the total
- Concrete: priced by the cubic yard, and the price varies widely by region and mix.
- Delivery: including any minimum load, short-load charge or pump fee.
- Base material: a 4-inch base of crushed stone covers the same area and takes roughly the same volume as the slab. You may need to order more, since loose stone compacts down.
- Excavation: digging out topsoil and hauling it away.
- Forms and hardware: lumber, stakes, wire mesh or rebar, chairs and expansion joint material.
- Tools: a screed board, float, edger and broom, or the rental of a plate compactor.
- Sealer: optional, and priced separately.
- Labor: if you hire someone, their fee usually covers prep, forms and finishing.
Doing it yourself or hiring out
Doing it yourself saves labor but takes more time and usually several helpers on pour day. A poor base, wrong slope or late finish can be expensive to fix, and that is where a crew’s experience can pay off. When you get quotes, ask for line items covering base depth, slab thickness, reinforcement, joints and finish, so you compare offers on the same terms.
People who search “What does a 20x20 concrete patio cost?” often find a wide range of answers, and the scope of work is usually the reason.
Ways to keep the cost in check
- Keep the shape simple. Squares and rectangles mean less cutting and fewer forms.
- Get the base right the first time, because repairing cracks later costs more.
- Compare quotes line by line rather than by the total.
- Plan the delivery day so the truck and helpers are ready when the concrete arrives.
- Consider whether a smaller patio would still meet your needs.
Smaller projects are a different calculation. For one, bagged mix may be practical, and the question “How many bags of concrete do I need for a 10x10 slab?” is a useful starting point.
Get local quotes before you commit
Prices depend on local supplier rates, labor costs and access to the site, so the most useful number is a quote from a supplier or contractor near you. Ask each one to state the volume, base depth and thickness they have assumed. If two quotes assume different thicknesses, you are comparing different jobs.