Flagstone Types

Crab Orchard Flagstone Patio

A practical guide to building a Crab Orchard flagstone patio: planning the layout, preparing the base, setting and sealing the stone, and staying safe.

On this page
  1. What Crab Orchard flagstone looks like
  2. Planning the size, layout and quantity
  3. Preparing the base
  4. Setting the stones: sand, mortar or concrete
  5. Filling the joints and setting the fall
  6. Sealing and everyday care
  7. Costs and doing it yourself
  8. Safety on the job

A Crab Orchard flagstone patio is a flat, natural-looking surface laid from Crab Orchard stone, a sandstone with a grainy texture and tan, gray and rust tones. If you are still asking what type of stone is crab orchard, the answer is sandstone.

The patio can be dry-set, with the stones bedded in sand, or wet-set, with the stones bedded in mortar or concrete. For a backyard that gets regular use, either method works when the base and drainage are done properly. Most of the effort goes into the base, the drainage and the joints, not the stone itself.

What Crab Orchard flagstone looks like

Crab Orchard is often sold as irregular, natural-cleft pieces. The stone splits along its natural layers, so the edges are uneven and the thickness varies a little from piece to piece. The colors vary too, which is part of the appeal, but no two pieces match exactly. Crab Orchard is one of several rock types sold as flagstone, so if you are comparing options, the guide to what are the different types of flagstones is worth reading first.

Look at samples both dry and wet. Stone darkens when it is wet, and a small sample can look different from the pile you are shown at the yard. Ask the supplier for the thickness range, because a wide range makes the base and bed harder to keep even.

Planning the size, layout and quantity

Sketch the patio to scale. Note the house wall, the doors, any steps, which way the yard drains, and where furniture and a grill will sit. Measure the area, then add a margin for curves and edges.

Ask how the stone is sold: by the ton, by the pallet or by the square foot. Coverage depends on thickness and on how irregular the pieces are, so compare like with like. For a rough sense of tonnage, work out how much is 1 ton of flagstone at the thickness you chose, then add a margin for breakage and cuts.

Mark the layout with stakes and string. Before you dig, call your local utility locator. In the United States, dial 811. Check with your local building office about permits and setbacks, since the rules differ from place to place.

If the patio will sit beside or under a deck, plan for the conditions there. Under a deck, the stone gets less sun and rain, which can slow drying and encourage moss, and you will need enough headroom to work comfortably.

Preparing the base

Dig out the area to the depth the job needs: the stone, the setting bed if you use one, and the base. A common guideline for a patio base is about 4 inches of compacted crushed stone. Use crushed stone rather than rounded gravel, because rounded stone does not lock together under a compactor.

Build the base in thin layers, roughly 2 inches at a time, and compact each layer with a plate compactor, which you can rent. Shape the fall into the base rather than into the stones. A common guideline is about 1/8 to 1/4 inch per foot, sloping away from the house.

Set a rigid edge around the perimeter, such as a concrete edge, metal edging or a row of set stone, so the bed and the stone cannot spread. Check the finished base with a level and a straight board before you set anything.

Setting the stones: sand, mortar or concrete

There are two main ways to set flagstone.

  • Dry-set: the stones sit on a layer of sand, usually about 1 inch thick, over the compacted base. This is easier to adjust and repair, and water can drain between the joints. It suits a casual patio on well-drained ground.
  • Wet-set: the stones are bedded in a layer of mortar or concrete, typically 1 to 2 inches thick, and the joints are mortared. It is more stable and suits a surface that must not move, but it takes more skill and time, and it is harder to repair later. For a step-by-step on this method, see how to lay a flagstone patio with concrete.

Dry-fit the pieces on the bed before you commit, so you can choose shapes that give even joints and place the cuts near the edges. Start at a straight reference line and work outward in small sections. Ask your supplier what mortar is best for flagstone in your climate, because mortar products and conditions differ by region.

Filling the joints and setting the fall

Joints can be filled with sand, polymeric sand or mortar. Sand and polymeric sand suit dry-set patios and let water through. Polymeric sand hardens when wet and resists washout and weeds, but it can leave a haze on the stone, so follow the label on watering and cleanup. Mortar suits wet-set patios. Keep mortared joints a little below the top of the stone, which is the usual finish. Wide, irregular joints are normal with flagstone, so the joint width will change from place to place.

Water must leave the patio. Keep the finished surface below the threshold of any nearby door, so water does not run indoors. Wondering what slope should you have on a patio? For most yards, a gentle fall of about 1/8 to 1/4 inch per foot away from the house is a common guideline.

Sealing and everyday care

Sandstone is porous, so a penetrating sealer can help it resist stains and moisture. Test the sealer on a hidden piece first, and follow the label for when to reapply, which for many products is every few years. Film-forming sealers can change the look of the stone and can make the surface slippery, so choose with care.

Day to day, sweep off debris, rinse with water and a mild stone cleaner, and clear moss and weeds early. Avoid acid cleaners, which can etch stone. Check for loose or rocking stones and reset them promptly, before water gets under them.

In cold climates, keep water from pooling on the surface so that ice does not lift the stones. Repointing flagstone patio joints is a separate job once the mortar starts to crack or crumble, and it is easier to do early than to wait.

Costs and doing it yourself

Cost depends on the stone price in your area, delivery, how much excavation and base material you need, the setting method, and whether you hire help. Stone is often only part of the total, so compare quotes that list the base and the setting method. For a 20 by 20 foot patio, how much does a 20x20 flagstone patio cost gives a wider view of the budget.

Is flagstone cheaper than concrete pavers? It depends. Labor, base work and stone thickness can change the answer as much as the material price does. If you are choosing between a stone surface and a poured one, the flagstone vs concrete patio decision mostly comes down to looks, repairs and budget.

A small patio is a reasonable first project for a careful beginner. A large or heavy job is hard work. Stone is heavy, and lifting it all day is hard on the back and hands, so plan for a helper and a stone cart. Renting a plate compactor and a wet saw is common.

Safety on the job

  • Wet concrete and mortar are caustic. Wear gloves, long sleeves and eye protection, and rinse any splashes right away.
  • Cutting stone makes fine silica dust. Wet the stone and the blade, and wear a dust mask or respirator rated for silica.
  • Lift heavy pieces with a cart or a helper, and keep your back straight.
  • Call 811 before digging in the United States, and have utility lines marked.
  • Keep children and pets away from the site and from wet mortar.
  • Do not place mortar or concrete in freezing weather, or ahead of heavy rain.

With basic care, a well-built Crab Orchard patio can serve for many years. These steps are general guidance, so check your product labels and local codes before you start.

Keep exploring

Guides from other topics

All topics →