Yes, flagstone can usually go on top of a concrete slab if the slab is sound and well drained, and each stone is bonded to it with mortar. Most of the work is in checking the slab, not in the stone.
When a slab is a good base
A slab is a reasonable base when it:
- has no wide, moving or spreading cracks,
- has no sunken or heaved sections,
- is clean, with no paint, sealer, oil or loose material that could stop the mortar from bonding,
- slopes away from the house and sheds water, and
- sits at a height that won’t cause trouble at doors, thresholds or steps.
When to fix the slab first
Some problems will show through the stone or undo the work:
- Wide or active cracks. Cracks can show through thin mortar and can crack the stone above them.
- Sunken or heaved areas. Stone laid on an uneven slab will rock, and mortar won’t correct the slab.
- Standing water. Water that sits on a slab can freeze in cold weather and push up on the stone.
- Crumbling concrete. Loose or flaking surfaces won’t hold a bond.
If the slab sits under a deck, check it for leaks from above and for patches that never dry.
How flagstone is set on concrete
The steps below follow the same logic as how to lay a flagstone patio with concrete:
- Clean the slab of dirt, grease and loose material.
- Apply a bonding agent if the mortar maker or product calls for one, and follow its directions.
- Mix the mortar to the consistency the product specifies, and spread a bed thick enough to support each stone. Use a mortar made for exterior stone, and check that it suits freezing winters if you have them.
- Set each stone into the bed, tap it level and check it for rocking with a level.
- Keep the joints even, and fill them with a mortar made for stone.
- Keep the mortar damp and protected while it cures, and keep foot traffic off until it has set. Cure times vary by product.
Slab joints and movement
Concrete moves with temperature and moisture, and most slabs have control joints. A stone laid across a joint can crack when the slab shifts. Ask the installer how they will handle joints, such as leaving a gap at the joint or cutting the stone to match it.
Height, drainage and headroom
Stone adds thickness, so check thresholds, steps and any door that opens onto the patio. Under a deck, the added height also cuts headroom. Keep the surface sloped away from the house, and make sure water has a way off the edges.
Other options if the slab is poor
If the slab is badly cracked, sunken or wet, the usual choices are to replace it or to lay stone over a new base. Covering the slab with pavers is a related route, covered in pavers over existing concrete patio.
The short answer
Yes, with a sound, clean, well-drained slab and a proper mortar bed. If the slab is cracked, sunken or wet, fix it first or choose a different base.