A 20 by 20 foot patio covers 400 square feet, about 37 square meters. There isn’t one fixed price for that area. The total depends on the stone you choose, how deep the base has to be, labor, the site and your local market, so compare quotes that cover the same scope.
What the area means for materials
Estimate each material from the area and the depth:
- Crushed stone base. At 4 inches compacted, 400 square feet needs about 133 cubic feet of base, which is roughly 5 cubic yards. Crushed stone shrinks when it is compacted, so the amount delivered will be more than that. Ask the supplier how much to order.
- Sand or stone dust. One inch over 400 square feet is about 33 cubic feet, or about 1.2 cubic yards.
- Flagstone. Stone is usually sold by the ton or by the pallet, and coverage depends on thickness and the size of the pieces. Ask the supplier how many square feet a ton covers at the thickness you’re buying, and ask how many sq feet are in a pallet of flagstone at that thickness.
- Joint fill and edging. Add these once you know the stone’s coverage, and include some waste for cuts.
The main cost drivers
- Stone type and thickness. Stone quarried locally is often cheaper than a specialty stone that has to be shipped in. Thicker stone adds weight, hauling and handling.
- Base depth and materials. A deeper base costs more in material and in time.
- Excavation and hauling. Removing soil and old surfaces takes labor, and the spoil has to go somewhere.
- Labor. Irregular stone takes more time to fit than uniform units, and labor is often a large part of the total.
- Slope and access. A sloped or hard-to-reach site needs extra grading and may need smaller equipment.
- Edging, drainage and permits. Check whether each quote includes them.
- Sealer and cleanup. These are optional, but they add cost.
How to compare quotes
Ask each contractor for:
- the price per square foot and the total,
- the base depth and the materials used,
- the setting method (dry-laid or mortared) and the joint fill,
- excavation, hauling and cleanup,
- edging, drainage and permit costs, and
- a written warranty or guarantee.
Get at least three quotes. A low bid that leaves out base depth or drainage may cost more later.
Ways to bring the cost down
- Choose a stone that is common in your area.
- Keep the shape simple. Fewer cuts means less labor.
- Do the clearing and hauling yourself, after the utility check and any permit steps.
- Phase the project, finishing the base and the main area first.
If you want a rough check against other stone patios, see how much does a 20x20 stone patio cost. Labor is often the biggest variable, so read how much to lay a flagstone patio alongside this one.
Under a deck
If the patio sits under a deck, expect more time and cost for tight access, smaller equipment, careful work around the posts and extra cutting. Ask each quote to say how it handles those.
Quick answer
Start from the 400 square feet, then check the base depth, the stone coverage and the labor before you budget. The number that matters is the installed price for your own site, and only local quotes can give you that.