Patio Slope and Drainage

Is 1% slope enough for drainage?

A 1% slope equals about 1/8 inch per foot. It's often a workable minimum on well-drained ground, but wetter sites usually benefit from closer to 2%.

On this page
  1. What 1% looks like
  2. When 1% is usually enough
  3. When to aim higher
  4. Watch the direction and the low point
  5. The rule for ground next to a house
  6. How to check your slope
  7. Signs 1% isn’t enough

For many patios on well-drained ground, a 1% slope is a workable minimum. It works out to about 1/8 inch of fall per foot. On wetter sites or slow-draining clay, a slope closer to 2%, or about 1/4 inch per foot, gives more margin. A small amount of settling can reduce a 1% fall over time, so building in a little extra is a sensible hedge.

What 1% looks like

One percent is about 1/8 inch per foot. Over a 10-foot run, that is about 1 1/4 inches of drop, and over 20 feet, about 2 1/2 inches. Because the number is so small, it is hard to see by eye. Measure it with a long level or a string line rather than judging by sight.

When 1% is usually enough

  • Flat-ish ground with sandy or loamy soil that drains well
  • A small patio where most of the runoff comes from its own surface
  • A well-compacted base that is unlikely to settle much

When to aim higher

  • Clay or other heavy soil that holds water
  • A patio that takes runoff from a roof, a driveway, or a sloping yard
  • Areas that get heavy rain or where puddles freeze in winter

On sloped yards, the options change, and patio ideas for sloped yards covers some of them.

Watch the direction and the low point

Even a 2% fall can fail if it runs toward the house or ends in a flat spot. Make sure the low side leads to a lawn, a drain, or a gravel drainage path. Porch floors have their own rules, which porch floor slope covers.

The rule for ground next to a house

If the patio meets the house or the soil sits against a foundation, a different rule applies. The US model residential code asks for the grade to fall at least 6 inches within the first 10 feet from the foundation. That is a much steeper fall than a patio needs, and it applies to the soil at the foundation itself. Local codes can differ, so check with your building department if the patio sits close to the house.

How to check your slope

  1. Set a string line between two stakes at the finished height, with a line level on it.
  2. Measure the drop from the string down to the base at each end.
  3. Divide the drop by the run length in feet to get inches per foot.
  4. Repeat at several points across the patio.

Signs 1% isn’t enough

  • Puddles that linger after rain
  • Moss or algae in the same spots every season
  • Water pooling along the edges, where it can wash sand out of the joints
  • Areas that have sunk since the patio was built

Drainage also depends on the soil, nearby hard surfaces, and local rainfall, so a single number can’t guarantee that water will leave the patio. If standing water keeps appearing near the house, a local contractor or landscape designer can check the site in person.

The complete guide to patio slope and drainage

Patio Grading Slope
Read the guide

Keep exploring

Guides from other topics