Patio Slope and Drainage

How much slope is needed for a paver patio?

For a paver patio, aim for about 1/8 to 1/4 inch of fall per foot away from the house, built into the base and sand bed as well as the surface.

On this page
  1. Why pavers need a slope
  2. What the numbers mean
  3. Where to aim in that range
  4. Setting the fall in the base
  5. Sloped sites
  6. Mistakes to avoid
  7. Checking your work

For most paver patios, aim for about 1/8 to 1/4 inch of fall per foot, or roughly 1% to 2%, sloping away from the house or other structure. The fall has to be built into the base and the sand bed, not just set by eye on the finished pavers, because the pavers follow whatever is underneath them.

Why pavers need a slope

Pavers have joints, and rain can soak through them into the sand and base. Some water runs off across the surface, and some moves down through the layers. A gentle fall lets surface water leave the patio, which reduces how much water stays in the base. Water that collects in the base can contribute to uneven settling over time.

What the numbers mean

  • 1/8 inch per foot is about 1 1/4 inches of drop over 10 feet
  • 1/4 inch per foot is about 2 1/2 inches of drop over 10 feet

On a 12-foot-wide patio, 1/8 inch per foot falls about 1 1/2 inches from one edge to the other.

Where to aim in that range

Many guides suggest the lower end on flat, well-drained ground. The higher end makes more sense where the soil drains slowly or where the patio takes runoff from a roof or driveway.

Steeper is not always better. A patio that falls too much is harder to walk on, can make furniture wobble, and doesn’t suit an accessible path. In the United States, accessibility guidelines limit the side-to-side slope of an accessible walking surface to 1:48, about 1/4 inch per foot.

Setting the fall in the base

  1. Remove topsoil and organic material, then compact the soil.
  2. Build the base from compacted crushed stone in layers. Set grade stakes or screed rails to the target fall as you go.
  3. Spread the bedding sand, usually about 1 inch, and screed it flat to the same fall.
  4. Lay the pavers, checking the fall with a level as you work.

Check the slope after each layer. A mistake in the base shows up on the surface, and fixing it later usually means lifting pavers. For the sand itself, our guide to best patio sand covers the options, and laying patio pavers on sand walks through the setting process.

Sloped sites

If the yard already slopes, you may be able to match the patio to the site with a gentle, even fall. On steeper ground, a single flat or sloped surface may not work well, and a stepped or terraced layout might suit it better. Patio ideas for sloped yards covers some of those layouts.

Mistakes to avoid

  • Sloping the surface but leaving the base flat, so water sits in the middle
  • Running the fall toward the house
  • Filling low spots with sand on top of the pavers instead of rebuilding the base
  • Skipping compaction, which lets the fall change over time

Checking your work

Before setting the last pavers, check the fall with a long level and a string line in several places. After the first good rain, look at where the water goes. Puddles that stay put usually point to a flat spot that needs fixing.

Local drainage rules and codes vary, so check them if the patio sits close to a building or a property line.

The complete guide to patio slope and drainage

Patio Grading Slope
Read the guide

Keep exploring

Guides from other topics

All topics →