Tile Over Old Concrete

How to lay outdoor tile?

Laying outdoor tile step by step: check the base, plan the layout, set each tile in exterior-rated mortar, then leave movement joints and grout.

On this page
  1. Start with the base
  2. Choose the method
  3. Plan the layout
  4. Mix and spread the mortar
  5. Set the tiles
  6. Leave movement joints
  7. Grout and seal
  8. Common mistakes

Start with the base

Outdoor tile needs a flat, sound, clean base, whether that’s new ground, an existing slab or a prepared bed. If you’re laying tile over old concrete patio slabs, check the slab for cracks, sealers, low spots and moisture before you buy anything. Clean and roughen the surface, and repair cracks with a product made for exterior use. The steps for installing patio tiles are similar on most bases, so the same care applies.

Can you lay tile directly over concrete? Yes, if the slab is sound, flat and clean, and you use an exterior-rated thinset. What should outdoor porcelain tiles be laid on? Anything flat, solid and well drained, which for most patios means a sound slab with a bonded layer of thinset.

Choose the method

Most outdoor tile is set one of two ways. Bonded tile is set in thinset on a sound slab, and it’s the standard approach for porcelain and stone. Pedestal or modular systems raise the tile on supports, which suits an uneven surface or one that needs better drainage. If you’re wondering how to install interlocking tiles, the process is simpler, but the base still has to be level and the supports spaced as the maker directs.

Plan the layout

Measure the area and sketch it. Pick a starting line, often a visible reference line near the center of the patio, and dry-lay a row to see how the cuts fall. Shift the layout if the edge pieces would be thin slivers. Order a little extra tile, often around 10 percent for cuts and breakage, and more for diagonal patterns.

Mix and spread the mortar

Mix the thinset to the consistency on the label, and mix only as much as you can use within its open time, the working window before it starts to set. Spread it with a notched trowel, covering an area you can finish in one go. For large tiles, back-butter each tile as well, so the mortar contacts the whole back.

Set the tiles

Press each tile into the mortar with a slight twisting motion, and use spacers to keep the joints even. Check level and lippage every few tiles with a straightedge, and tap high edges down with a rubber mallet. If the mortar has started to skin over, lift the tile, re-spread the mortar and reset it.

Cut tiles with a wet saw. Wear eye and dust protection, and cut curves or cutouts with a tile nipper or a grinder fitted with a diamond blade.

Leave movement joints

Don’t grout across joints that need to flex. Leave movement joints where the patio meets walls, posts and other fixed points, and across the field at the spacing the tile maker gives. Fill them with flexible sealant. Where you can, line them up with slab control joints so the movement follows a planned path.

Grout and seal

Once the mortar has set for the time on its label, remove the spacers and grout the joints with exterior-rated grout. Pack the grout in with a rubber float, then wipe the tile faces with a damp sponge in diagonal passes. Polish the surface once the grout firms up. Let the grout cure fully, and seal it or porous tile if the product calls for it.

Common mistakes

  • Setting tile on a damp, dirty or unsound base.
  • Using indoor-only tile or mortar that isn’t rated for outdoor use.
  • Skipping movement joints, so the tile cracks as the slab moves.
  • Laying the surface flat or sloping it toward the house, so water pools or runs at the wall.
  • Grouting too early, or leaving grout too long before it’s wiped.
  • Walking on fresh tile before the mortar has set.

The complete guide to tile over old concrete

Tile Over an Old Concrete Patio
Read the guide

Keep exploring