Installing patio tiles outdoors comes down to choosing one of three methods: bonding the tiles to a concrete base with adhesive or mortar, setting them on a bed of sand over a compacted base, or raising them on adjustable pedestals above a hard surface. The right method depends on the tile’s thickness, what it will sit on and how well the surface drains. Whichever you use, the base matters more than the tile. Most failures, such as rocking tiles, cracks and standing water, start with a base that was soft, uneven or too flat to drain. Follow the tile maker’s instructions too, since they set the minimum thickness, the adhesive and the joint width.
Start with the tile type
Outdoor tiles fall into two broad groups. Thin tiles, often around 10 mm (about 3/8 inch) thick, need a rigid, bonded base and should not be relied on to carry loads by themselves. Thicker outdoor porcelain pavers, often around 20 mm (about 3/4 inch), are made to sit on a compacted base, and many can also go on sand or pedestals. Check the data sheet for the thickness and the methods the maker allows.
Porcelain absorbs very little water, but that does not make every porcelain tile fit for outdoor use. Look for a label that says frost resistant or rated for outdoor use.
Three ways to lay outdoor tiles
- Bonded to concrete: tiles are fixed to a sound, sloped slab with an exterior-rated adhesive or mortar. This gives the flattest, most stable finish and suits thin tiles, but the slab has to be in good shape.
- Sand-set on a compacted base: pavers sit on a layer of bedding sand over compacted gravel, with their edges held in place. This suits thicker pavers. The base must drain well, because water that gets through the joints has to go somewhere.
- On pedestals: adjustable supports hold the tiles above a hard, sloped surface, such as a roof terrace, a waterproofed deck or a sound slab. Pedestals make leveling easier and let air and water move underneath, but they do not fix a poor surface. They are a common choice on decks, so read can you tile on a deck before you commit, since the framing and the waterproofing decide the answer.
The answer to what should outdoor porcelain tiles be laid on depends on the method, so pick the method first. Interlocking deck tiles are a fourth option for light use on a firm base. They click together without adhesive. For that job, see how to install interlocking tiles.
Prepare the base and the slope
Whatever method you use, the base needs to meet three conditions:
- Stable: soft soil, old fill, roots and turf all settle. Remove them and compact the ground where the tiles will sit.
- Flat, with fall: the surface should be even enough for the tiles to lie flat, with a fall of about 1 to 2 percent (roughly 1/8 to 1/4 inch per foot) so water runs away from the house.
- Free-draining: standing water under or on the tiles leads to staining, frost damage and movement.
Use string lines, a long straight edge and a level to check the fall before you lay anything. Set the high point at the house and let the surface drop away from it. For how much slope is needed for a paver patio, the 1 to 2 percent figure above is the usual starting point.
For a sand-set job, call before you dig. In the US, that means calling 811. Then dig to the depth the design needs, compact the base in layers, and screed a bed of sand to about 1 inch (25 mm) using two straight guides. Set edge restraints so the pavers cannot spread. Before you dig, read can I lay pavers directly on dirt: for a patio that has to stay level, the answer is usually no.
Lay bonded tiles
- Check the slab. It should be sound, clean and cured, with no loose material. Cracks, paint and sealers need dealing with first. For the slab checks, read can you lay tile directly over concrete. An old slab has extra issues, which are covered in tile over old concrete patio.
- Plan the layout. Dry-lay a few rows to see the pattern and the cuts. Avoid very narrow slivers at the edges, and center the pattern where you can.
- Mix the adhesive to the maker’s instructions, and only as much as you can use within its working time.
- Spread the adhesive with a notched trowel sized to the tile. Back-butter large tiles too, so the bond covers the whole tile. Hollow spots under a tile trap water, and water that freezes there can crack it.
- Set each tile with a slight twist, then check it with a straight edge. Keep the joints even with the spacers the maker recommends.
- Check your coverage. Lift a tile now and then to see that the adhesive covers its back.
- Leave movement joints where the maker or installer advises, usually at the house wall and across large areas.
- Let it cure before you walk on it or grout it. Follow the adhesive’s timings and keep the surface clear of frost until it has set.
- Grout or fill the joints with an exterior-grade product that suits the tile.
Adhesive labels are read the same way for floors as for walls, and which adhesive is best for exterior wall tiles explains what to look for on the bag.
Sand-set pavers, step by step
- Excavate to depth and compact the base in layers, checking the fall as you go.
- Spread and screed the bedding sand. Work from pavers you have already laid, not from the screeded sand.
- Lay each paver and tap it down with a rubber mallet, checking it against the screed level.
- Cut the edge pieces to fit.
- Sweep sand or a polymeric sand into the joints. Compact the surface only with a protective pad under the plate, and only if the maker allows it. Then wet the joint filler as its instructions say.
Joints, spacing and movement
Joint width depends on the product and the method. Bonded tiles usually take grout, and sand-set pavers take sand or polymeric sand. Check the data sheet for the right width, use the spacers it recommends, and keep them consistent, since uneven joints are one of the most visible faults in a finished patio.
Movement joints matter on large areas. Tiles expand and contract with temperature, so leave movement joints where the maker or installer advises, usually at the house wall and across the field. Fill them with a flexible sealant rather than rigid grout, which cracks when the surface moves.
Cutting and finishing
Porcelain and stone cut best with a wet saw fitted with a diamond blade. Keep the blade wet, and wear eye protection and a respirator, because the dust can contain silica. Wipe the faces of the tiles with a damp sponge before the grout or joint filler sets, so haze does not dry on the surface.
Common mistakes
- Laying onto soil or loose sand that was not compacted, so tiles sink and rock.
- Too little fall, so water pools, or a fall that slopes toward the house.
- Thin or patchy adhesive, which leaves hollow spots that hold water.
- No movement joints across a large area.
- Using interior adhesive, grout or mastic outside.
- Walking on fresh adhesive or sand before it has set.
- Finishing too high, so the patio rises toward the door threshold or the house’s siding.
Keep the surface in good condition
Sweep and rinse the surface regularly, using a mild cleaner the tile maker approves. Avoid acid cleaners and wire brushes, which can dull or damage the finish. After heavy rain or frost, check for loose or lifting tiles and fix them early. Top up sand joints as they wash out, and refill or reseal grouted joints when they wear. Tiles laid over wood need different upkeep, so see outdoor patio tiles over wood deck.
When to hire a professional
Get a qualified installer for a large area, a raised patio, a surface on a deck or roof, an older slab that has moved, or any job where the fall or the height could affect the house. Some areas require a permit or inspection for raised surfaces and for work close to the house, so check with your building department before you start.