Lay pavers on sand by building a firm base first, then setting the pavers on a thin, level layer of sand. The base carries the load and drains water. The sand only levels the pavers. The steps below follow the usual order for a walkway or patio.
Check the layout, slope and utilities
Mark the edges of the patio with stakes and string. Plan the surface to slope about 1/8 to 1/4 inch per foot, away from the house or other structures, and mark that slope on your stakes.
Before you dig, call 811 in the US so underground utilities can be marked.
Dig out and build the base
Dig down far enough for the base, the bedding sand, and the pavers. For a standard paver about 2 3/8 inches thick, the total depth often comes to about 7 to 8 inches. Remove roots, sod, and soft soil, then compact the native ground.
Add crushed stone base in layers of about 2 inches, compacting each layer with a plate compactor before you add the next. Keep the base sloped to match your surface, and check it with a level and string line. The finished base should feel firm, with no soft spots.
Pavers generally should not sit directly on dirt. Many people ask, “can I lay pavers directly on dirt?” Usually not, because dirt holds water and shifts, so the surface sinks in places. The first answer to “what should you put down before laying pavers?” is a compacted base, and the bedding sand goes on top of it.
Set the edge restraints
Install edge restraints around the perimeter before the sand goes down. Stake them firmly and set their top at the height of the finished pavers. They keep the pavers from spreading outward over time.
Spread and screed the bedding sand
Spread about 1 inch of coarse, angular concrete sand over the base. Screed it level by pulling a straight board across two pipes or rails set at paver height. Then lift the pipes and fill the gaps.
Do not compact the bedding sand. Walk on it as little as possible, and prepare only as much as you can lay that day. Rain can wash the sand out of level, so cover it or work in smaller sections if rain is coming.
Set the pavers
Start at a straight edge, such as the house wall or an edge restraint, and lay pavers tightly across the area. Use the joint width the manufacturer specifies. Many pavers have spacer nibs that set the gap for you.
Tap each paver into the sand with a rubber mallet. Every few rows, check the surface with a straight edge laid across several pavers. To fix a high or low spot, lift the paver, add or remove a little sand, and set it again.
Cut the edge pieces last. A masonry saw with a diamond blade or a paver splitter will do the job. Wear eye protection.
Compact and fill the joints
When the pavers are set and checked, run a plate compactor over the surface with a rubber pad to seat them in the sand. Sweep joint sand over the surface and work it into the gaps with a broom. Compact again, add more sand, and repeat until the joints are full. Sweep off the extra.
For polymeric sand, follow the bag. Most products call for light misting and then no more water. Too much water can wash the sand out or leave a haze on the pavers. Check the label for temperature and weather limits.
Does polymeric sand harden like concrete? Not quite. It firms up in the joints, which helps the pavers stay put, but it is not the same as solid concrete. When you buy, many people ask, “how much polymeric sand do I need?” The bag’s coverage chart, based on your joint width and paver size, is the best guide.
Common mistakes
- Skipping the base, or making it too thin for the traffic it will carry.
- Compacting the bedding sand before the pavers are set.
- Using play sand or fine beach sand for the bedding.
- Leaving out edge restraints.
- Overwatering polymeric sand, which can wash it out or leave a haze.
- Working in heavy rain or freezing weather.
After the patio is done
Keep heavy traffic off until the joint sand has set, following the bag’s directions. After the first heavy rain, sweep the surface and look for low spots. Refill the joints as needed.