Pavers on Sand

Laying Patio Pavers on Sand

Learn how to lay patio pavers on sand, covering the compacted base, bedding sand, edge restraints, slope, joint sand and common mistakes to avoid.

On this page
  1. What each layer does
  2. Tools and materials
  3. Plan the slope and drainage
  4. Excavate and build the base
  5. Set the edge restraints
  6. Screed the bedding sand
  7. Lay the pavers
  8. Compact and fill the joints
  9. Common mistakes
  10. Keeping it level over time
  11. When to bring in a professional

Laying patio pavers on sand is the usual method for residential patios and walkways. The pavers sit on a thin layer of sand, and that sand sits on a compacted base of crushed stone. The base carries the weight and helps water drain away. The sand only levels the pavers.

A common question is: can I lay pavers directly on sand? The short answer is that a base is strongly recommended. Sand alone tends to settle and shift under foot traffic, and heavy rain can wash it out of place.

This guide covers the layers, the tools, the steps in order, and the mistakes that cause most problems. Base depth and drainage needs vary with soil and climate, so check local recommendations for your site.

What each layer does

From the bottom up:

  • Subgrade: the native soil. It should be cleared of roots and organic material, then compacted.
  • Compacted base: crushed stone that carries the load and lets water drain through.
  • Bedding sand: about 1 inch of coarse sand that the pavers are set into and leveled on.
  • Pavers: the surface layer, laid with narrow, even joints.
  • Joint sand: fine sand, or polymeric sand, swept into the gaps to lock the pavers together.
  • Edge restraints: a border that holds the field of pavers in place.

If one layer is weak, the others usually show it. Pavers that sink in one spot often point to a base problem.

Tools and materials

You will need:

  • Pavers, plus about 5 to 10 percent extra for cuts and breakage
  • Crushed stone base material
  • Coarse concrete sand for the bedding layer
  • Joint sand or polymeric sand
  • Edge restraints made of plastic, metal, or concrete, with stakes
  • Landscape fabric or geotextile (optional, but useful in soft soil to keep the soil out of the base)
  • A shovel, rake, and wheelbarrow
  • A plate compactor, usually rented
  • A level, a straight board, and a string line
  • Two pipes or screed rails of the same diameter, for leveling the sand
  • A rubber mallet and a rubber compactor pad to protect the pavers
  • A masonry saw with a diamond blade, or a paver splitter, for cuts
  • A broom and a garden hose

Plan the slope and drainage

A patio should slope away from the house and other structures. A common guideline is about 1/8 to 1/4 inch of fall for every foot. Mark the high and low points with stakes and string before you dig, so the base can follow the same slope.

If you are unsure how much slope is needed for a paver patio, start with that guideline and adjust for your site. Water that pools on the surface after rain is a sign the slope or base needs work.

People often ask, “will water drain through pavers?” Some water does, through the joints and into the base, but filled joints slow it down. On the surface, the slope usually does most of the work.

Excavate and build the base

Before you dig, call 811 in the US so underground utilities can be marked. Then mark the outline of the patio and dig down.

The total depth often comes to about 7 to 8 inches for a standard paver about 2 3/8 inches thick. That covers roughly 4 inches of base, 1 inch of bedding sand, and the paver itself. Driveways and areas that will carry vehicles need a much thicker base, and soft or clay soil may need more. Check local recommendations.

Remove roots, sod, and soft soil, then compact the native soil with the plate compactor. If you are using landscape fabric, lay it now and overlap the seams.

Spread the crushed stone in layers of about 2 inches, and compact each layer with several passes before adding the next. Keep the base sloped to match the surface, and check it with a level and string line as you go. The finished base should feel firm underfoot, with no soft spots.

Many people ask what’s the difference between paver base and gravel. Paver base is crushed stone with a range of particle sizes, including fines, that compacts into a firm, stable layer. Round gravel, such as pea gravel, does not lock together the same way, which is why it makes a poor base for a patio.

It’s tempting to ask: can I skip the gravel and just use sand under pavers? Usually that is not a good idea, because sand does not compact into a stable base and the surface will shift over time. The answer to “what should you put down before laying pavers?” starts with a compacted base, then a thin layer of bedding sand.

Set the edge restraints

Install edge restraints around the perimeter before you spread any sand. Stake them firmly, and set the top level with the finished paver surface. Plastic, metal, and concrete restraints all work when they are installed well. Without them, pavers can spread outward and the joints open up over time.

Screed the bedding sand

Spread coarse sand over the compacted base to a depth of about 1 inch. Level it by pulling a straight board across two pipes or screed rails set at paver height. Then lift the pipes and fill the gaps with sand.

Use coarse, angular, washed concrete sand, not play sand or fine beach sand. Coarse, angular grains hold their shape and level out more evenly, while play sand is too fine for a bedding layer. If you are weighing options, the best patio sand for this job is the coarse, angular kind.

Do not compact the bedding sand. Walk on it as little as possible, and prepare only as much as you can lay that day. Rain can wash the sand out of level, so cover it or work in smaller sections if rain is coming.

Lay the pavers

Start at a straight edge, such as a house wall or an edge restraint, and work across the area. Set each paver gently on the sand with its joints close and even. Many pavers have spacer nibs that set the gap automatically. If yours do not, follow the joint width the manufacturer specifies.

Many people ask, “what is the proper spacing for pavers?” The manufacturer’s answer is the one to follow, because consistent spacing makes the joints fill evenly and keeps the pattern true.

Tap each paver into the sand with a rubber mallet. Every few rows, lay a straight edge across several pavers to check for high or low spots. To fix one, lift the paver, add or remove a little sand, and set it again. Avoid walking on the bedding sand, and work from the pavers you have already laid.

Cut the edge pieces last. Mark them so the cuts sit where they are least noticeable. A masonry saw with a diamond blade, ideally a wet saw to control dust, or a paver splitter will do the job. Wear eye protection and a dust mask.

Compact and fill the joints

Once the pavers are set and checked, run the plate compactor over the surface with a rubber pad to seat them in the sand. Sweep joint sand over the surface and work it into the gaps with a broom. Compact again, add more sand, and repeat until the joints are full. Sweep off the extra.

Polymeric sand needs more care than plain sand. Follow the bag, which usually calls for light misting with water to activate the binders and then no more water. Too much water can wash the sand out or leave a haze on the pavers. Check the label for temperature and weather limits before you start.

Some people ask, “what is better than polymeric sand for pavers?” For some patios, regular joint sand is enough, especially if you expect to re-sand the joints every so often.

People also ask, “how much polymeric sand do I need?” The bag’s coverage chart, based on your joint width and paver size, is the most reliable guide, so buy enough to finish in one go.

Common mistakes

  • Skipping the base, or building it too thin for the traffic it will carry.
  • Compacting the bedding sand before the pavers are set.
  • Using play sand or fine beach sand for the bedding layer.
  • Leaving out edge restraints, so the pavers spread.
  • Ignoring the slope, so water pools on the surface.
  • Setting pavers on soft or unprepared soil.
  • Making the joints too wide, which lets weeds and washout in.
  • Working in heavy rain or freezing weather.

Keeping it level over time

Once the patio is in, sweep it a few times a year and check the joints. Refill them when sand washes out or weeds begin to show. After heavy rain, look for low spots and standing water.

If a paver settles, lift it, add or remove a little bedding sand, reset it, and compact again. Early repairs are quicker and cheaper than waiting for a larger section to sink.

When to bring in a professional

Consider hiring help if the patio is large, the site is steep or wet, the patio will carry vehicles, or you are unsure about base depth or drainage. Utilities close to the dig site are another reason to get a professional involved.

A good installer should be able to tell you the base depth, the sand type, the edge restraints, and how they plan to handle slope and drainage before work starts.