Concrete Shed Bases

What is the 4 2 1 rule for concrete?

The 4-2-1 rule is a rough mix ratio: 4 parts gravel, 2 parts sand and 1 part cement by volume. Here's what it means and when to use bagged mix.

On this page
  1. What the 4-2-1 rule means
  2. Why it is only a rough guide
  3. Bagged mix or mixing from scratch
  4. Safety when mixing
  5. Where it fits a shed slab

What the 4-2-1 rule means

The 4-2-1 rule is a rough mix ratio for concrete, measured by volume. It calls for 4 parts coarse aggregate, usually gravel or crushed stone, 2 parts sand and 1 part Portland cement. Water is added on top of that. You may also see it written as 4:2:1. It is a traditional rule of thumb for mixing from separate materials, not a specification for any particular strength.

Why it is only a rough guide

Volume ratios vary. Damp sand takes up more space than dry sand, the size of the gravel and how loosely it is packed change how much fits in a bucket, and the amount of water you add changes the final mix. The rule gives a starting point, not a precise recipe. Anything structural, such as footings or load-bearing walls, should follow the design or the local code rather than a rule of thumb.

Bagged mix or mixing from scratch

Bagged concrete already contains the aggregate and cement in set proportions. You add water and mix, which is less work and more predictable for a small slab. Mixing your own means buying three materials, measuring each one the same way and keeping the batches consistent. Inconsistent batches can give uneven results.

If you do measure by volume, use the same bucket or scoop for every part so the ratio holds from batch to batch. Add water gradually and stop when the mix is workable. Too much water weakens concrete.

Safety when mixing

Cement is alkaline. Wet concrete and cement dust can irritate skin and eyes, and long contact can cause burns. Wear waterproof gloves, long sleeves and eye protection. Use a dust mask when you handle dry cement or powder.

Where it fits a shed slab

The 4-2-1 rule describes the mix, not the thickness of the slab. A shed slab is usually about 4 inches thick, and the gravel base and forms go in before any concrete. Readers planning a pour often ask “What should I put down before I pour concrete?” The answer starts with a compacted gravel base.

The complete guide to concrete shed bases

Laying a Concrete Foundation for a Shed
Read the guide

Keep exploring

Guides from other topics

All topics →