A 20x20 paver patio covers 400 square feet. What it costs depends mostly on the pavers you choose, how much base and sand the site needs, the equipment you use, and who does the work. Costs vary a lot by region, so use the quantities below to work out your own numbers, and get local quotes before you commit.
Work out the quantities first
Most of the cost is materials, so start there:
- Base: a 4-inch base over 400 square feet is about 133 cubic feet, or roughly 5 cubic yards of crushed stone.
- Bedding sand: about 1 inch of sand over 400 square feet is about 33 cubic feet, or roughly 1.2 cubic yards.
- Pavers: buy the area plus about 5 to 10 percent extra for cuts and breakage, so roughly 420 to 440 square feet of pavers.
- Joint sand: the amount depends on joint width and paver size. For the question “how much polymeric sand do I need?” the bag’s coverage chart is the best guide.
Suppliers usually sell base and sand by the ton or cubic yard, so ask them to convert your numbers to their units. Confirm the base depth with your installer or local guidance, since soft soil and vehicle use call for more.
What drives the price
Paver type. Concrete pavers usually cost less than natural stone. Specialty textures, unusual colors, and thicker units add to the price.
Site condition. Removing an old patio, digging out soft soil, and fixing slope or drainage all add labor and material.
Pattern. A simple layout such as running bond uses fewer cuts than a curved or complex design, which takes more time and produces more waste.
Access. Materials and equipment have to reach the site. Narrow side gates and long carries across a lawn slow the job and add to the labor.
Permits. Some areas require permits for certain work, so check local rules before you start.
DIY or hire a crew
Doing the work yourself removes the labor cost, but not the materials. Excavation, base work, and compaction are the most physical parts and take the most time. The main costs of a DIY job are equipment rental, such as a plate compactor and a wet saw, and your time over several days.
A contractor’s bid should spell out demolition, excavation, base depth, edge restraints, bedding sand, joint sand, compaction, cleanup, and any warranty. Crews often finish a patio this size over several days, weather permitting.
Pavers over an existing slab
If you already have a concrete slab, is it cheaper to install pavers over concrete? It can be, since you skip most of the excavation. But the slab’s condition, its height, and its slope change the answer. A cracked or uneven slab may need repair first, and the bed for the pavers has to suit the slab. Get a quote for both options before you decide.
Compare quotes and keep costs reasonable
Many people ask, “how much would a 20x20 paver patio cost?” The honest answer is a range that depends on your area and choices, so the best test is to compare quotes line by line. Get at least three written quotes, and ask each one to list the base depth, the sand type, and the edge restraints.
A related question is, “is it cheaper to lay concrete or pavers?” The answer depends on the finish, local labor rates, and how much preparation the site needs, so compare quotes for each option.
To keep costs reasonable:
- Choose a simple pattern and standard paver sizes.
- Do the demolition and hauling yourself, if you can.
- Buy a few extra pavers from the same batch for future repairs, since color and size can vary between production runs.
- Ask whether a smaller patio or a phased build would fit your budget.